2nd Aug 09 2 1/2" Rally 9 Aug 2009 Tue 25 Aug 2009   August 2009  

 Not a lot has been going on at the grounds work wise. He we have a signal lever been installed down by the carriage sidings

   

========================================================================

 The few lads have been very busy in the heat of the day digging to put the tube in for signal cables. Plus there was a couple of loco running 1 is a new member with a 5 inch gauge Polly. The lads on Thursday evening have been busy on the high level track. The new grass looks very good as well.

 

 

====================================================================================================

 

 

The top 2 photographs where taken on the 2nd August Dave and Peter sorting the start of the next bit. Signal ducting around the new track bed.  Then I found that a new job had started on the raise track.  

  

 

====================================================================================================

 

   On the 2 August we had the annual 2 & 1/2" gauge rally at our club I have done a full web page with big photographs with video of cause. 

I was asked to take a picture of here best side.

 

====================================================================================================